Montrose ConcreteMontrose Concrete

Concrete footings in Montrose CO - dug to the right depth and checked before the pour

Building a deck or addition and unsure how deep to dig? We get the lines marked and the holes inspected before any concrete goes in.

A straight flight of dark concrete steps climbs between black metal railings across a grassy yard.
  • Licensed and fully insured.
  • Free quotes on site.
  • Replies within 1 business day.

What are concrete footings, and does your Montrose project need them?

Concrete footings are the wider pad or strip of concrete under a foundation wall, post or column that spreads the weight into the soil, and in Montrose we dig them, get them inspected and pour them for decks, additions, garages and walls.

Most people call us when a deck, an addition or a new wall is on the drawings and somebody has said the footings come first, and they do, because everything above sits on them. The price moves with how many footings you need, how deep and wide they have to be, how easy the ground is to dig and how close we can get a truck. The schedule turns less on the pour than on the wait for the utility locate and the inspection between digging and pouring. If you're planning the walls too, our foundation installation work picks up right where the footings leave off. When I come out, I'll tell you what I see and what we'd do, so you've got your own figure instead of a guess.

How do you know your project needs new footings?

  1. Deck posts on loose blocks

    If your deck posts sit on precast blocks or bare dirt, the ground under them moves every time it gets wet, dries out or freezes. That shows up as a deck that sags or bounces, and the longer it goes, the further the framing above gets pulled out of line.

  2. A porch pulling from the house

    A gap opening between a porch, step or small addition and the house usually means it was set on a shallow footing, or none, and the soil moved under it. Waiting lets water into that gap and the drop gets bigger, which turns a footing job into a repair.

  3. New plans calling for footings

    If you've got a deck, addition or wall drawn up, the footings are the first thing built and the first thing checked. Leave them to the last minute and the rest of the job sits waiting on a hole in the ground.

How we build concrete footings

I start by finding out which building office covers your address, because that office sets how deep your footings go. We call in the utility locate before a shovel touches the ground, lay out where each footing goes, then dig down to firm soil at the depth the office set and square up the bottom of each hole. We line up the inspection so the hole gets checked before any concrete goes in, then set forms and rebar, the steel bars that keep the concrete from pulling apart, and pour. After that the concrete has to cure, which is the wait while it gains strength, before anyone builds on it. Nobody sees a footing again once the deck or wall is on top, and that's exactly why it's the last place I'd save you money. I'd rather spend it on the hole than on a nicer finish somewhere you'll actually look.

Footings often run into concrete that's already there. If a new post has to go through an old patio or slab, we use concrete cutting to open a clean hole instead of breaking out more than we need. If a wall or porch has already settled on a weak footing, foundation raising can bring it back up before we add anything new beside it.

  • Continuous footings

    These run the full length of a foundation wall and carry its weight along the whole line. They suit additions, garages and long walls, where the load sits everywhere the wall does.

  • Pad footings

    A pad sits under one post, pier or column and takes that single load. It's what most decks, porch posts and carports need, since the weight comes down in a few spots rather than along a wall.

Get a free footing quote for your Montrose property

Send the form with your address, the kind of project and a few site photos, and we'll reply within one business day. I'll come out, look the site over and give you a free quote, with no pressure to book.

(970) 964-6176
Email
hello@montroseconcrete.com
Based in
Montrose, CO 81401
Hours
Mon–Sun: 7 AM–11 PM

What happens after you call about footings?

Here's how a footing job runs from your first call to the final walkthrough, so you know what you're waiting on at each stage.

  1. Call or send us a message

    Tell us the address and what's going on top of the footings, such as a deck or an addition, and send a few photos if you can. We'll get back to you and set a time to come out.

  2. Walk the site with me

    I come out, look at the ground and how we'd get to it, and ask how you'll use what's going on top. Then I go over the estimate line by line, so you know what each part costs and why before you decide anything.

  3. Line up permit and locate

    We check with the office that covers your address and walk you through what it asks for. The utility locate goes in before any digging, and we keep you posted while we wait.

  4. Dig, inspect, pour, walk through

    We dig, the hole gets inspected, and only then do we pour and finish the footings. Before we leave, I walk you through the cure and how to look after it.

Why Montrose builders and homeowners call Montrose Concrete for footings

  1. The owner sees your job

    I come out to look at the job myself, and I'm on site with our crew when the footings get dug and poured. The person who heard how you'll use it is the one watching the hole go in.

  2. In business since 2013

    We've been pouring concrete since 2013, and I learned the trade by pouring it and asking why. So I'll explain where each footing goes and why before we dig, and twice if you want.

  3. Licensed and fully insured

    We're licensed and fully insured on the footing jobs we take around Montrose and Delta. If something goes wrong on your property during the work, you're not the one left holding it.

On a footing, what counts is the part you won't see again once the framing goes up. Call (970) 964-6176 or send us a message and I'll come take a look.

Footings, permits and soil in Montrose

Who signs off on your footings depends on where the property sits. Inside city limits, the city's Building Services issues building permits and does plan checks and inspections for the work on its list, which includes structural work. Out in the county, the county's Building Department handles plan review and inspections. Whether your footing needs a permit is that office's call, so we find out before we schedule, and where one's needed we help you sort out the paperwork.

The ground here is the other reason I won't pour into a hole nobody's checked. Along Cedar Creek and Montrose Arroyo there's a sediment tied to sinkholes and hollow spots underground that can badly damage buildings, and every big city in Colorado sits partly on clay that swells when wet and shrinks when dry, which we run into on jobs in Montrose and Delta alike.

Questions about concrete footings in Montrose

How much do concrete footings cost in Montrose?

The cost comes down to how many footings your project needs, how deep and wide each one has to be, and how hard the ground is to dig. Tight access, an old slab that has to be cut through, or an inspector asking for a soils study all add to it. I'll price your job on site and go over the estimate line by line, so you know what each part is for.

How do I find out how deep my deck footings need to go in Montrose?

Ask the building office that covers your address for the frost line, which is how deep the ground freezes, because that sets the depth. A national deck guide has deck footings rest on undisturbed soil at least 12 inches down or below the frost line, whichever is deeper, and it sends builders to the local office for that frost figure. We'll help you work out which office is yours and dig to what it says.

Do I have to call 811 before digging footing holes in Colorado?

Yes, Colorado law has property owners contact Colorado 811 at least 48 hours before any digging, not counting weekends, legal holidays or the day you give notice, and digging deck holes counts. 811 doesn't mark private lines, such as one running out to a detached garage, so you'll need those marked separately before anyone digs. We build that wait into the start date.

Does a footing hole have to be inspected before the concrete is poured?

Usually, yes. Under that national deck guide, the building official checks the soil on site before any concrete is placed, and a soils investigation follows where weak soil is likely. So plan on an inspection between the dig and the pour, and possibly a soils study, and we schedule the pour around it.

How close to my house can a deck footing be?

Under the same deck guide, a deck footing closer than 5 feet to the house's foundation wall rests at the same level as the house's own footing. That usually means digging a good deal deeper near the house, so we look at where your posts land when we lay it out.

How long does it take to get concrete footings in?

Most of the time goes to the steps around the pour, not the pour itself. You've got the 811 wait, any permit review, the inspection between digging and pouring, and then the cure before anyone builds on top. We'll lay out that order for your job at the estimate so your framing doesn't get booked too early.

  • Foundation raising

    When an older wall, porch or slab has dropped because the ground moved under it, raising it back up usually comes before new footings go in beside it.

  • Concrete cutting

    If a new post or pier has to land where there's already a patio, slab or walkway, a clean saw cut opens the spot without wrecking the rest.

Footing work in Montrose, Delta and nearby

Montrose Concrete is based in Montrose, Colorado, and we pour footings in Montrose, Delta and the cities around them. Those 2 cities each have their own page here, and they aren't the only places we work.

Montrose, CO

Get your footings planned before the dig

Calling early leaves room for the 811 wait and the inspection, so the crew framing your deck or addition isn't standing around waiting on a hole.